Deep copying assets
The process of copying an asset together with its associated items is known as deep copying.
When deep copying, associated items can optionally be included or excluded, such as:
subassets
standard service plans
maintenance checklist items
You can also specify how many deep copies you want to make. This is especially useful if you are required to enter the same data multiple times.
*You can deep copy assets with a Disposed status. However, archived assets cannot be deep copied.
You can deep copy assets, using the following procedure:
Procedure
1. At the Assets selection level, select the asset you want to deep copy.
2. On the action panel, click Deep copy asset.
The Copying […] dialog box is displayed.
3. In the Property field, select a property to which the asset should be copied.
4. In the Number of copies field, type the required number of deep copies.
5. Specify which items associated with the selected asset you want to copy by selecting the relevant checkboxes in the dialog box.
6. Click OK.
The specified number of deep copies is made, with each copy including the selected items.
*A deep copy does not include existing asset locations. However, a new asset location is automatically created for each copied asset, which only specifies the property you selected. Any other relevant asset location data must be entered manually.