Field change sequence in Work Orders
If you modify field data at the Orders selection level, other field data may change automatically, because (default) data of one element is dependent on (default) data of another element. If a series of automatic changes takes place, some data changes take precedence over other data changes. The following table specifies which field data 'outrank' other field data.
Field data which is linked to high-ranking elements (i.e. those with the highest numbers) will overwrite the data of lower-ranking elements.
As you can see, data in the
Priority field can be overwritten quite easily, while
Standard order data will overwrite the default data of most other elements. Refer to
Field changes exemplified for some examples.
Sequence | Modification of field value |
---|
10 | Priority |
20 | Cost center |
30 | Department |
50 | External tradesperson |
70 | Space |
80 | Requestor |
100 | Asset |
115 | Property |
120 | Order group |
130 | Trade |
140 | Externally assigned by |
1000 | Start date-time |
1000 | End date-time |
2000 | Standard order |
Field changes that involve inheriting field values from other elements are not incorporated in this table.